top of page

Montauk Marina 

IMG_2426.HEIC

For this project, the client required new framing and decking while adhering to a budget. To achieve this, we retained the existing piles and reinforced the structure with new 3x8 cross braces and 6x6 stringers, ensuring long-term durability and stability.

We also installed custom gangways at an elevated height to accommodate rising tides, delivering functionality and resilience against changing environmental conditions. AMC collaborates with leading manufacturers to provide clients with premium materials and tailored solutions for every project.

Given this marina’s role in supporting commercial fishermen, we equipped each slip with the necessary utilities for operational efficiency. Each slip features:

  • ●  48-inch 8x8 pedestals with dual 50 Amp 125/250V twist-lock receptacles

  • ●  Dual 30 Amp 125V twist-lock receptacles

  • ●  Dual hose faucets

  • ●  Energy-efficient LED lighting with photocells

    This project underscores AMC’s commitment to providing durable, functional, and cost-effective solutions for commercial waterfront properties while ensuring client satisfaction and compliance with industry standards.

IMG_2886.HEIC
IMG_2527.HEIC
IMG_2216.HEIC
bottom of page